Clarum Homes Office
PROJECT |
||
Project Name: | Clarum Homes Office | |
Completion Date: | 2013 |
|
Building Type: | Low Rise Commercial Office Building |
|
Project Description: | The comfort and performance of Passive House isn’t only for the home! This site is a commercial office building, built and occupied by Clarum Homes, and EID Architects-- a Passive House builder and architecture firm (respectively) with a mission to transform the way people live. |
|
Location: |
94306
Palo Alto, CA
|
|
No. of units: | 1 |
|
Construction Type: | Wood Frame |
|
Construction Cost: |
TEAM |
|
Owner: | Clarum Homes |
Architect/Designer: | EID Architects |
Engineer/s: | Beyond Efficiency/ Katy Holbacher |
PH Consultant: | Katy Holbacher |
Contractor: | Clarum Homes |
Other: | |
Miscelaneous: |
PREDICTED PERFORMANCE |
METRIC VALUES |
|
Treated Floor Area: | 5049 ft2 |
469 m2 |
Typical Calc. Area: | 6000 ft2 |
|
Exterior Walls: | 24.00 hr.ft2.ºF/BTU |
0.237 W/m2K |
Floor/Slab: | 11.00 hr.ft2.ºF/BTU |
0.516 W/m2K |
Roof: | 40.00 hr.ft2.ºF/BTU |
0.142 W/m2K |
Overall Window: | 4.00 hr.ft2.ºF/BTU |
1.420 W/m2K |
Window Frame: | 5.00 hr.ft2.ºF/BTU |
1.136 W/m2K |
Window SHGC: | 0.34 |
0.34 % |
Entry Door: | 2.00 hr.ft2.ºF/BTU |
2.839 W/m2K |
Ventilation: | 71.00 % |
71.00 % |
Heating Source: | Electric Heat Pump |
|
Cooling Source: | Electric Heat Pump |
|
Hot Water Source: | Electric Heat Pump |
|
Airtightness: | 0.60 ACH50 |
0.60 ACH50 |
Green materials: | ||
Annual Heat Demand: | 4.35 kBTU/ft².yr |
13.72 kWh/m2yr |
Heating Load: | 3.00 BTU/ft².hr |
9.46 W/m2 |
Primary Energy Value: | 38.00 kBTU/ft².yr |
119.87 kWh/m2yr |
CERTIFICATION |
|
Certification: | |
Issued by: |