The Magic House
PROJECT |
||
Project Name: | The Magic House | |
Completion Date: | 2013 |
|
Building Type: | SF Residential |
|
Project Description: | This intentional community aims to demonstrate how humans can obtain more use value (e.g., home, workplace, recreational facility, social gathering space) per unit of resource depletion and environmental degradation. Normal use of 20,000 square feet is compacted down to 5,600 square feet. The home features clever use of mini-split heat pumps and ventilation systems to provide flexible zoning at a minimum of cost. A post-tensioned slab at the ground floor allows for maximum height for basement windows to allow plentiful day-lighting. |
|
Location: |
Palo Alto, CA
|
|
No. of units: | 1 |
|
Construction Type: | ICF (Insulated Concrete Form) |
|
Construction Cost: | $280 |
TEAM |
|
Owner: | Magic |
Architect/Designer: | John Northway, Alena Campagna, Tony Carrasco, Grace Lee, Kathleen Liston, Pearl Renaker, Roy Pertchik, and Joshua Moore |
Engineer/s: | Allen Gilliland, Pearl Renaker, Luke Morton, Matt Groves |
PH Consultant: | Pearl Renaker |
Contractor: | Dan Fulga |
Other: | Jo Crosby, Ph.D., P.E. - geotechnical; Dan Dyckman, P.E. - grading/drainage; Bijan Aalami, Ph.D., M.ASCE (ADAPT Corporation) - structural concrete; Jim Dillingham, P.E. (D&Z Engineering)) and Mark Brehmer P.E. (D&Z Engineering) - structural wood and steel |
Miscelaneous: |
PREDICTED PERFORMANCE |
METRIC VALUES |
|
Treated Floor Area: | 5208 ft2 |
484 m2 |
Typical Calc. Area: | ||
Exterior Walls: | 23.00 hr.ft2.ºF/BTU |
0.247 W/m2K |
Floor/Slab: | 22.00 hr.ft2.ºF/BTU |
0.258 W/m2K |
Roof: | 38.00 hr.ft2.ºF/BTU |
0.149 W/m2K |
Overall Window: | 4.00 hr.ft2.ºF/BTU |
1.420 W/m2K |
Window Frame: | 3.61 hr.ft2.ºF/BTU |
1.573 W/m2K |
Window SHGC: | 0.24 |
0.24 % |
Entry Door: | 2.00 hr.ft2.ºF/BTU |
2.839 W/m2K |
Ventilation: | 80.00 % |
80.00 % |
Heating Source: | Electric Heat Pump |
|
Cooling Source: | Electric Heat Pump |
|
Hot Water Source: | Electric Heat Pump |
|
Airtightness: | 0.60 ACH50 |
0.60 ACH50 |
Green materials: | Reused Brick, remilled lumber, used appliances, LED Lighting, low-flow fixtures |
|
Annual Heat Demand: | 4.38 kBTU/ft².yr |
13.82 kWh/m2yr |
Heating Load: | 2.00 BTU/ft².hr |
6.31 W/m2 |
Primary Energy Value: | 38.00 kBTU/ft².yr |
119.87 kWh/m2yr |
CERTIFICATION |
|
Certification: | |
Issued by: |